Check tall-storage elevations against the building-services drawing before ordering. The selected Chuangjie units are 2200 mm high and the selected Xuying standalone units are 2160 mm high. A footprint review alone can miss a device, access panel or service route behind or above the cabinet.
Catalogue examples and dimensions
| Catalogue range | Catalogue reference | Listed dimensions (mm) |
|---|---|---|
| Chuangjie | HDB02-2022 | 2000 × 400 × 2200 |
| Chuangjie | HDB03-2422 | 2400 × 400 × 2200 |
| Xuying | XYB03-1621 (Standalone use) | 1600 × 400 × 2160 |
| Xuying | XYB04-2021 (Standalone use) | 2000 × 400 × 2160 |
Survey the wall through the complete furniture height
Mark outlets, switches, access covers and visible services on a finished-wall elevation. Include projections and the opening movement of any cover. Record which details were measured on site and which remain dependent on another contractor’s final information.
Compare the exact selected cabinet height and outline with that elevation. A 40 mm difference between two outside heights does not establish that either clears a particular device. Use measured positions and the actual furniture drawing rather than a presumed standard mounting height.
Refer service clearances to the responsible team
Have the relevant project team review any detector, sprinkler, ventilation or other service affected by the proposed furniture. Obtain the applicable requirement for that installation instead of assigning a generic clearance in the furniture order. The catalogue does not determine building-service compliance.
Keep a relocation request separate from a furniture adjustment. If a service must move, identify who designs, approves and performs the change. Do not approve a cabinet on the assumption that an unseen service can be moved later without cost or coordination.
Preserve maintenance access after assembly
Show how each retained service point can be reached with the cabinet installed and in use. If access requires a removable furniture part, obtain its intended method and confirm that the action is practical. An outline drawn around a device is not proof of a usable maintenance procedure.
Retain the accepted coordinated elevation and any unresolved service items with the order release. At handover, record the as-installed arrangement so later changes to storage do not obscure the agreed access. Furniture and building-service approvals should remain identifiable in the project record.
Questions before ordering
Can floor-plan fit prove tall storage avoids services?
Review the full-height elevation and actual device positions.
What clearance should be used around a detector or sprinkler?
Have the responsible project team define and approve the applicable requirement for the installation.
Can a hidden outlet be accepted because a cabinet is removable?
Confirm a practical, intended access method and its responsibility before approval.
What to include in the quotation request
- Measured full-height service elevation
- Exact cabinet outline and installation details
- Responsible-team clearance or relocation decisions
- Accepted maintenance-access and as-installed record
Catalogue basis and confirmation
The reference and dimension examples come from the 2026 Yiwan English catalogue, Chuangjie and Xuying. They support the purchasing comparison above. The selected components, materials and any required performance are confirmed through the supplier drawing and written order specification. Catalogue imagery is a design reference, not evidence of completed GulfForma projects.