Keep LJA03, LJA04, LJA05 and LJA06 identifiable when comparing tender offers. LJA03 and LJA06 share the listed 2400 or 2600 mm length options; LJA04 and LJA05 share 2000 or 2200 mm. All selected rows have a 2000 mm second dimension and 750 mm height. That dimensional match is a starting point for comparison, not a declaration of equivalence.
Catalogue examples and dimensions
| Catalogue range | Catalogue reference | Listed dimensions (mm) |
|---|---|---|
| Ruijie | LJA03-2620 | 2400 × 2000 × 750; 2600 × 2000 × 750 |
| Ruijie | LJA04-2220 | 2000 × 2000 × 750; 2200 × 2000 × 750 |
| Ruijie | LJA05-2220 | 2000 × 2000 × 750; 2200 × 2000 × 750 |
| Ruijie | LJA06-2620 | 2400 × 2000 × 750; 2600 × 2000 × 750 |
Name the reference specification and the offered alternative
Give the buyer’s required model and selected size one line, then identify the bidder’s offered reference beside it. Add the drawing revision and finish identifiers for both. An offer saying only equivalent executive desk prevents the reviewer from locating what has actually changed.
Retain the complete selected dimensions even where they match. Some rows contain more than one length, so a common reference code can still conceal a different size selection. Have the bidder mark every departure from the required drawing instead of assuming that unmentioned components remain identical.
Compare scope in a short deviation schedule
Include top and return construction, support arrangement, storage contents, visible finishes and accessories relevant to the project. For each item, show required, offered and the evidence used to accept it. A generic catalogue range description is insufficient for an unresolved model-specific detail.
Separate a proposed improvement from a confirmed requirement. Extra equipment or a different cabinet may affect space, services and maintenance even if it appears commercially attractive. Request a priced and technically defined alternative so the buyer can accept the whole change intentionally.
Close the tender decision before production approval
Record accepted deviations in the order specification and remove superseded assumptions from the approval pack. Keep an unaccepted alternative clearly outside the production scope. The supplier’s final drawing should correspond to the model and components that the buyer approved.
At inspection, use that accepted specification rather than the original tender image alone. If a later material or component change is proposed, return it through the same approval process. Equal dimensions do not justify an unrecorded substitution after the commercial comparison is complete.
Questions before ordering
Can LJA03 and LJA06 be treated as identical because sizes match?
Compare their drawings and scope. The selected rows do not establish identical construction or accessories.
What if a bidder supplies no deviation list?
Ask for an explicit model and component comparison before accepting the alternative.
Which specification should inspection follow?
The final order specification with accepted deviations and its matching approved drawing.
What to include in the quotation request
- Required and offered models with selected sizes
- Component and finish deviation schedule
- Evidence and decision for every accepted change
- Final order drawing and inspection basis
Catalogue basis and confirmation
The reference and dimension examples come from the 2026 Yiwan English catalogue, Ruijie. They support the purchasing comparison above. The selected components, materials and any required performance are confirmed through the supplier drawing and written order specification. Catalogue imagery is a design reference, not evidence of completed GulfForma projects.