Xingtu Desks: Approve Cable Exits Before Cutting or Drilling the Furniture

Approve XTA02 and XTA03 cable exits before production. Coordinate equipment leads, service routes and component openings without assuming standard drilling.

Reviewed 20 November 2026 · 3 min read · GulfForma project team

Xingtu catalogue reference illustration for executive desks review
Catalogue illustration. The selected model, configuration and finish are recorded in the approved specification.

Confirm cable openings on the selected Xingtu drawing before authorising production or site drilling. XTA02-2216 and XTA03-2216 share listed 2000 or 2200 × 1600 × 750 mm options, but those dimensions do not locate a cable exit. XTA02 explicitly states L/R versions; the selected XTA03 cell does not carry that wording.

Catalogue examples and dimensions

Catalogue rangeCatalogue referenceListed dimensions (mm)
XingtuXTA02-2216; L/R versions2000 × 1600 × 750; 2200 × 1600 × 750
XingtuXTA03-22162000 × 1600 × 750; 2200 × 1600 × 750

Start with the actual equipment connections

Identify the devices and the direction their power and data leads leave each item. Show the proposed monitor, docking station, telephone and any equipment on the return. Check connector sizes as well as cable diameters when reviewing an opening.

Ask how the leads reach the building service without crossing a drawer, moving part or user’s legs. A neat line drawn across a plan does not establish an accessible physical route. Mark where a cable must be disconnected or threaded during installation.

Locate the opening on the correct component drawing

Have the supplier dimension each approved opening from identifiable edges of the exact top or panel. Include the cover, trim and any separately supplied cable accessory. A global room coordinate does not tell the factory which panel receives a hole.

For XTA02, check the chosen L/R version before copying an opening position. For XTA03, obtain the actual arrangement rather than assuming the same handing or underside construction. The common outside dimensions do not demonstrate that the two tops have interchangeable drilling details.

Control changes after approval

Keep a marked cable-opening drawing in the production approval pack. If the equipment changes, review whether the opening and route remain suitable before accepting the substitution. Do not ask the installer to solve an undocumented conflict by drilling through a finished part.

For any proposed site modification, obtain supplier approval of the location, method and consequences for the furniture. Agree who performs it and records the result. At handover, retain the completed route drawing so later IT work does not rely on a hidden cable path.

Questions before ordering

Do the models include standard cable holes?

The selected dimension rows do not establish the opening scope or location. Confirm it on the order drawing.

Can XTA02 drilling be copied directly to XTA03?

Only after verifying the actual component and underside details with the supplier.

What if equipment changes after production approval?

Review the opening and cable route and approve a documented change before fabrication or site work.

What to include in the quotation request

  • Equipment connector and cable-route schedule
  • Component-level opening dimensions
  • Selected arrangement and approved accessory scope
  • Production revision and handover route drawing

Catalogue basis and confirmation

The reference and dimension examples come from the 2026 Yiwan English catalogue, Xingtu. They support the purchasing comparison above. The selected components, materials and any required performance are confirmed through the supplier drawing and written order specification. Catalogue imagery is a design reference, not evidence of completed GulfForma projects.