An AV cable route should connect the actual devices, not stop at a symbol on the table top. XTD01-2412H and XTD02-3212H are listed at 2400 and 3200 mm lengths with a common 1200 mm width and 750 mm height. Their outside dimensions do not show openings, connector access or the route around the table supports.
Catalogue examples and dimensions
| Catalogue range | Catalogue reference | Listed dimensions (mm) |
|---|---|---|
| Xingtu | XTD01-2412H | 2400 × 1200 × 750 |
| Xingtu | XTD02-3212H | 3200 × 1200 × 750 |
Draw the devices and both ends of each connection
List the room equipment and show where each cable starts and ends. Identify which connections stay installed and which users make during a meeting. Ask the IT or AV team to define the applicable equipment and cable requirements rather than treating all leads as interchangeable.
Mark the building entry point and the proposed table opening on one coordinated drawing. Include the connector bodies and any plug-in device that must pass through or remain accessible. A small cable line can conceal a much larger installation opening requirement.
Check the route through the table construction
Obtain a section and underside plan showing the selected supports, panels and any agreed cable accessory. Confirm how the lead passes each interface and where it can be accessed later. Do not assume the larger XTD02 uses the same opening positions as XTD01.
Review any change in support position or table orientation with the AV layout. If a cable must be installed before assembly or routed through a closed component, record that sequence. The catalogue model suffix does not establish an included AV kit or a removable service panel.
Agree the installation and future-access record
Identify who provides the cables, creates the approved openings, installs equipment and completes testing. Keep furniture work and site connection work on clear scope lines. Where a proposed opening changes, revise the component drawing before fabrication.
After installation, retain the cable-route drawing and photographs of access points before they are concealed. Record the method for replacing a lead without unnecessary furniture dismantling. Future equipment changes should refer to that route instead of assuming that an existing opening accommodates every connector.
Questions before ordering
Does an H suffix prove an AV kit is included?
The selected dimension rows do not establish accessory inclusion. Confirm the itemised scope.
Can a cable route be approved from a top view alone?
Check the connectors, underside construction and access sequence as well.
What if the table is rotated?
Review the complete route and service relationship before approving the new orientation.
What to include in the quotation request
- Device and connection schedule
- Coordinated top, underside and service-route drawings
- Approved opening and assembly sequence
- Installation tests and future-access record
Catalogue basis and confirmation
The reference and dimension examples come from the 2026 Yiwan English catalogue, Xingtu. They support the purchasing comparison above. The selected components, materials and any required performance are confirmed through the supplier drawing and written order specification. Catalogue imagery is a design reference, not evidence of completed GulfForma projects.