Workstation IT Handover: Keep Furniture Acceptance and Connection Checks Linked

Record workstation IT commissioning by position after furniture installation. Link device tests, cable routes and unresolved items to the approved desk layout.

Reviewed 20 November 2026 · 3 min read · GulfForma project team

A workstation handover should connect the furniture position with its equipment and service checks. XTA04 and LJC02 illustrate different single-sided envelopes: 600 and 660 mm second dimensions, with different overall heights. Those catalogue figures cannot confirm a working data connection or identify which installed cable serves a particular desk.

Catalogue examples and dimensions

Catalogue rangeCatalogue referenceListed dimensions (mm)
XingtuXTA04-A1200 × 600 × 1030
XingtuXTA04-B; Extension1200 × 600 × 1030
RuijieLJC02-A(With steel frame)1200 × 660 × 750
RuijieLJC02-B(Extension)1200 × 660 × 750

Create position identifiers before equipment is connected

Use the approved room layout to label each working position and relevant service point. Link the furniture reference and accessory scope to that identifier. Keep the catalogue model separate from the operational desk number so several identical pieces remain individually traceable.

Agree which team installs and tests the building connection, furniture accessory and end-user equipment. A handover can remain incomplete even when one team’s work is finished. Make those boundaries visible before the installation date rather than resolving them after users move in.

Record the checks actually carried out

Have the responsible IT or electrical team define the applicable checks for its equipment and services. Record the device or outlet tested, result, date and person responsible. Do not convert a visual furniture inspection into evidence that a powered accessory or data connection functions.

Where a cable route changes during installation, update its position record and confirm the approved access arrangement. Check that connection labels still match after furniture has been moved or an extension added. A successful test at one desk should not be copied to untested positions.

Close exceptions with an identified owner

List an unresolved item against its position, describe the practical effect and assign responsibility for correction. Distinguish a missing furniture part from a network or device issue. This makes the handover usable without requiring each team to interpret a broad remark such as desk not working.

Retain correction and retest results with the original finding. Give the facilities and IT teams the accepted layout, connection labels and access instructions. Future moves should update the same record, preserving the difference between furniture identity and the service that was connected to it.

Questions before ordering

Does a furniture inspection confirm data and power operation?

No. Have the responsible team perform and record the applicable connection checks.

Can one test result cover all identical desks?

Record which positions were actually checked and keep untested scope explicit.

How should an unresolved issue be described?

Identify the position, observed problem, responsible team and correction or retest needed.

What to include in the quotation request

  • Position-to-service and furniture reference map
  • Agreed responsibilities and commissioning checks
  • Actual results and labelled connection routes
  • Exception ownership, correction and retest record

Catalogue basis and confirmation

The reference and dimension examples come from the 2026 Yiwan English catalogue, Xingtu and Ruijie. They support the purchasing comparison above. The selected components, materials and any required performance are confirmed through the supplier drawing and written order specification. Catalogue imagery is a design reference, not evidence of completed GulfForma projects.