In a desk replacement project, survey the power, data and equipment that must remain before choosing a Ruijie alternative. The selected LJA10 to LJA13 rows cover second dimensions of 1600, 1800 and 2000 mm, with L/R versions stated. A new desk can fit within the room while blocking an existing outlet or changing access to retained equipment.
Catalogue examples and dimensions
| Catalogue range | Catalogue reference | Listed dimensions (mm) |
|---|---|---|
| Ruijie | LJA10-2018; (L/R versions) | 2000 × 1800 × 750 |
| Ruijie | LJA11-2418; (L/R versions) | 2400 × 1800 × 750 |
| Ruijie | LJA12-2016; (L/R versions) | 1800 × 1600 × 750; 2000 × 1600 × 750 |
| Ruijie | LJA13-2620; (L/R versions) | 2400 × 2000 × 750; 2600 × 2000 × 750 |
Mark retained services as surveyed facts
Identify each service point on a measured plan and photograph it with a location label. Record whether it sits in the wall, floor or an existing furniture component. Distinguish a service that must remain from one the project team has agreed to move.
Include plug and connector access, cable exit direction and the equipment’s maintenance needs. A dot on a plan does not describe an outlet’s usable access once the return or cabinet is installed. Ask for the furniture section that passes through each critical retained point.
Compare the selected depth and handed arrangement
LJA10-2018 lists 2000 × 1800 mm and LJA11-2418 lists 2400 × 1800 mm. LJA12-2016 lists 1800 or 2000 mm lengths at 1600 mm depth, while LJA13-2620 lists 2400 or 2600 mm at 2000 mm depth. All selected rows list 750 mm height.
Choose one exact size and orientation, then place the actual return and supporting components on the survey. Keep an alternative that requires relocated services separate from one that preserves them. This lets the buyer compare the site-work consequence alongside the furniture offer.
Coordinate the replacement work and reconnection
Identify who disconnects equipment, moves the old furniture, protects retained services and reconnects the new arrangement. Agree the office access period and any work that must happen outside occupation. Do not include electrical modification implicitly in a furniture supply line.
After installation, record the approved cable route and accessible service points for maintenance. Test the relevant equipment with the responsible IT or electrical team and retain any outstanding items. A successful furniture assembly alone does not complete the retained-service acceptance.
Questions before ordering
Does a matching room footprint preserve the old outlet access?
No. Compare the actual return, cabinet and support positions with the surveyed services.
Can service relocation be included in an equivalent desk offer?
Itemise and approve it as part of the alternative’s site-work scope.
Who should confirm equipment reconnection?
Allocate it to the relevant responsible team and record the agreed checks at handover.
What to include in the quotation request
- Measured retained-service plan and photographs
- Exact model, size and L/R drawing
- Separate furniture and service-relocation alternatives
- Disconnection, reconnection and acceptance responsibilities
Catalogue basis and confirmation
The reference and dimension examples come from the 2026 Yiwan English catalogue, Ruijie. They support the purchasing comparison above. The selected components, materials and any required performance are confirmed through the supplier drawing and written order specification. Catalogue imagery is a design reference, not evidence of completed GulfForma projects.