Yuechi Storage Compositions: Keep the Centre and End Units Visible

Build a traceable Yuechi storage schedule from FYB cabinet references and listed compositions, with the correct component counts and wall elevation.

Reviewed 17 November 2026 · 3 min read · GulfForma project team

FYB05-2020 catalogue illustration for storage selection
Catalogue illustration. The selected model, configuration and finish are recorded in the approved specification.

Yuechi storage compositions should be ordered from their component references and overall elevation, not from a total width alone. The catalogue includes individual FYB units and separate combined rows using several references. Reconcile those units before pricing so a listed wall composition does not become an unexplained bundle.

Catalogue dimensions

Catalogue referenceListed L × W × H (mm)
FYB05-20202000 × 400 × 2080
FYB04-16201600 × 400 × 2080
FYB03-12201200 × 400 × 2080
FYB02-0820800 × 400 × 2080
FYB01-0620600 × 400 × 2080
FYB06-10201000 × 400 × 2080
FYB06-1020 FYB01-0620 FYB02-08202400 × 400 × 2080
FYB06-1020 FYB01-0620 FYB03-12202800 × 400 × 2080
FYB06-1020 FYB01-0620 FYB04-16203200 × 400 × 2080
FYB06-1020 FYB01-0620 FYB05-20203600 × 400 × 2080

Identify the role of every cabinet

Use the individual-unit table to identify the available overall widths. The selected units share a listed 400 mm depth and 2080 mm height, but their internal use still needs confirmation. Mark open display, closed storage and any equipment positions on the proposed elevation.

A shared outer height does not prove that shelves or doors line up across every possible pairing. Choose a listed combination or request an approved composition drawing showing the actual junctions, façade and finish breaks.

Check the listed composition rather than adding freely

The combined rows name multiple FYB references. Preserve all of them in the quotation schedule and ask whether any repeated or finishing components are included. A component appearing in the wall reference should not also be counted as a separate extra unit unless intentionally required.

For the installation wall, record usable length, ceiling or bulkhead conditions, skirting and nearby services. Clarify any filler, top clearance or wall fixing through the order drawing. The catalogue dimensions should not be treated as site setting-out instructions.

Give the receiving team a useful map

Label each component against the overall elevation and room. Request package identifiers that allow adjoining pieces to be reunited after receiving, and identify where connectors and hardware are packed. This is particularly useful when similar-looking units serve several offices.

Confirm Golden Copper + Morandi samples and the selected lighting or electrical provisions before release. Keep those details with the wall composition so visual matching and functional inclusion are checked against the same reference.

Questions before ordering

Can I order only the overall combined size?

Provide it, but retain the component references and an approved elevation. The size alone may not identify the included units or connections.

Are all individual FYB units interchangeable in a composition?

Do not assume this. The supplier must confirm the façade, connections, internal requirements and exact combined configuration.

What to include in the quotation request

Send the following with the selected catalogue references so the supplier can respond to the same requirement:

  • Selected composition and individual FYB references
  • Component count and wall elevation
  • Storage contents, lighting and finish requirements
  • Room-by-room labels and receiving sequence

For a UAE, Saudi Arabia or wider GCC project, include the destination and required receiving date. Request a line-by-line response, identify any deviations and confirm destination services expressly.

Catalogue basis and confirmation

The model and dimension table is based on the 2026 Yiwan English catalogue, Yuechi collection. It describes catalogue references rather than verified project deliveries. The selected order drawing and written specification define the supplied configuration; request supporting evidence for any required material or performance claim.