If cable trays are specified, hand over an accessible route and a component record rather than only a tidy first-day photograph. SHC09-2816-2 and XTC03 examples have different complete envelopes and heights. Their selected dimension rows do not confirm that a tray is included, how it opens or what equipment it can accommodate.
Catalogue examples and dimensions
| Catalogue range | Catalogue reference | Listed dimensions (mm) |
|---|---|---|
| Senya | SHC09-2816-2 | 2800 × 1600 × 1150 |
| Xingtu | XTC03-A; With steel legs | 1550 × 1200 × 1030 |
| Xingtu | XTC03-B; Without steel legs | 1550 × 1200 × 1030 |
Confirm the tray and its contents as ordered items
Identify the tray reference, dimensions, fixing method and exact furniture position. List the power supplies, cable bundles and other items intended for it. Have the supplier confirm the usable capacity and any restrictions for that actual configuration.
Keep building electrical work and furniture accessories distinct. A general cable-management line can conceal whether the order includes a tray, power distribution or only openings in the furniture. Request a drawing that shows the route from the building service to the working position.
Demonstrate access with the workstation occupied
Open or reach the tray using the proposed installation method and record which tools or movable furniture parts are needed. Check access with the actual chair, storage and nearby equipment in place. A tray that is easy to reach before the desks are installed may be obstructed afterward.
Ask the responsible team to demonstrate the agreed maintenance procedure. Identify any panel that must remain removable and any cable that limits access. Do not assume a decorative cover is intended to carry equipment or be removed repeatedly without supplier instructions.
Retain a clear route and component register
Label relevant service points, accessory references and opening positions on the handover drawing. Record the accepted arrangement of equipment and any planned reserve space without inventing a universal spare-capacity percentage. Give the facilities and IT teams the applicable care and access instructions.
When additional equipment is proposed, compare it with the documented tray and routing limits. Keep any revised arrangement in the same record so later support staff can identify what changed. Closing the initial cable route is only part of a maintainable workstation installation.
Questions before ordering
Do the selected models automatically include trays?
Confirm the itemised accessory scope. The dimension rows alone do not establish inclusion.
Should access be checked before or after nearby furniture is placed?
Demonstrate the procedure in the intended installed arrangement, including obstructions.
How much reserve tray space is required?
Define it from the equipment and maintenance brief and confirm the usable capacity with the supplier.
What to include in the quotation request
- Tray reference, fixing and equipment schedule
- Building-to-desk cable-route drawing
- Demonstrated maintenance-access procedure
- Handover labels, limits and revision record
Catalogue basis and confirmation
The reference and dimension examples come from the 2026 Yiwan English catalogue, Senya and Xingtu. They support the purchasing comparison above. The selected components, materials and any required performance are confirmed through the supplier drawing and written order specification. Catalogue imagery is a design reference, not evidence of completed GulfForma projects.