Skip to content
Executive desks

Sendi Made-to-Order Desks: Freeze the Specification Before Batch Production

Specify SDA desk references from the Sendi made-to-order sheet with selected dimensions, component scope and approvals before scheduling a production batch.

Reviewed 17 November 2026 · 3 min read · GulfForma project team

SDA01-3222 catalogue illustration for executive desks selection
Catalogue illustration. The selected model, configuration and finish are recorded in the approved specification.

The source workbook labels this Sendi collection Made to Order. Treat an SDA reference as the start of a defined order specification, not evidence of stock or a fixed delivery promise. Select the listed size, confirm the complete arrangement and agree approval conditions before planning the production batch.

Catalogue dimensions

Catalogue referenceListed L × W × H (mm)
SDA01-32223200 × 2200 × 750
SDA01-28222800 × 2200 × 750
SDA02-26202600 × 2000 × 750
SDA02-24202400 × 2000 × 750
SDA03-22182200 × 1800 × 750
SDA03-20182000 × 1800 × 750

Record the dimensional choice for each office

The selected SDA references cover several overall size groups. Match each chosen reference to its room and quantity, retaining the full code and dimensions. Similar model prefixes should not cause different offices to be grouped under a single ambiguous desk line.

Provide the layout with the working chair, visitor positions, equipment and access routes. Ask for the top and return or storage components to be identified on the drawing. An overall footprint is not a substitute for a manufacturing and inclusion schedule.

Define what made to order will mean for this purchase

List the requested material, Victor Oak + Dark Iron Gray finish allocation, hardware and cable provisions. If a change from the listed configuration is needed, request an explicit response describing feasibility, revised drawings and any effect on the programme or quotation.

Confirm the required sample route and what approval releases production. A made-to-order sheet does not establish unlimited customisation, a particular minimum quantity or a universal production period. The supplier needs to confirm the actual order conditions.

Control repetition across the batch

Keep the accepted sample, drawing revision and room schedule together. Record any difference between office types so an approved change for one reference is not silently applied to all desks. The final BOQ should show the exact quantity at each configuration.

Agree inspection checks and how model and room identifiers will carry into packing and receiving. Schedule transport and local assembly separately from the production period. A required opening date needs a programme that includes approvals, production, inspection, shipment and site work.

Questions before ordering

Does Made to Order tell me the current lead time?

No. Obtain a dated order-specific programme with its approval triggers and the transport and site responsibilities separated.

Can I assume every requested size or material is available?

No. Ask the supplier to confirm the proposed change, drawing, sample and commercial scope before treating it as an offered configuration.

What to include in the quotation request

Send the following with the selected catalogue references so the supplier can respond to the same requirement:

  • SDA references, selected sizes and room quantities
  • Required changes and included components
  • Sample and drawing approval milestones
  • Destination, receiving date and local service needs

For a UAE, Saudi Arabia or wider GCC project, include the destination and required receiving date. Request a line-by-line response, identify any deviations and confirm destination services expressly.

Catalogue basis and confirmation

The model and dimension table is based on the 2026 Yiwan English catalogue, Sendi (Made to Order) collection. It describes catalogue references rather than verified project deliveries. The selected order drawing and written specification define the supplied configuration; request supporting evidence for any required material or performance claim.